1. A-Z of Services
  2. A
  3. B
  4. C
  5. D
  6. E
  7. F
  8. G
  9. H
  10. I
  11. J
  12. K
  13. L
  14. M
  15. N
  16. O
  17. P
  18. Q
  19. R
  20. S
  21. T
  22. U
  23. V
  24. W
  25. X
  26. Y
  27. Z

Agenda, decisions and minutes

Venue: Hybrid / Council Chamber

Contact: Anne Jenkins  Governance Team Leader

Media

Items
No. Item

1.

Apologies for Absence

Additional documents:

Minutes:

None received.

2.

Declarations of Interest

Additional documents:

Minutes:

None received.

3.

Minutes of the Last Meeting pdf icon PDF 154 KB

Additional documents:

Minutes:

The Minutes from 18 October 2023 were accepted as a true record.

4.

September Revenue Budget Monitor Report pdf icon PDF 350 KB

Additional documents:

Minutes:

The first report presented by the Leader explained the current forecast position on the Council’s revenue budget and the financial risks and opportunities within the July update.

 

This was the second revenue budget monitor report presented to Cabinet this financial year and it reflected an underspend of £3.5m, which was a £0.5m improvement on the July figures.

 

This position considered the contingency budget and the anticipated in-year underspend against capital financing budgets.

 

Whilst an overall underspend was projected, it was noted that service areas were collectively forecast to overspend by £3.5m, excluding schools.

 

This update provided confirmation that some of the known risks, as at the start of the year, have materialised and were causing significant overspends, especially within Children’s Services. It was anticipated however, that it would be possible to offset service area overspends with the general contingency and underspends within capital financing.

 

The key variances contained within the overall position included:

 

(i)                An increased demand across key social care areas including children’s out of area and emergency placements. These two areas alone contributed an overspend of almost £4.5m to the overall service position.

 

(ii)               An increased demand within adult residential and non-residential services also contributed £2.1m to the overall service position. This was, however, offset by the overachievement of community care income as a result of an increased number of users contributing to their care.

 

(iii)              Significant pressures were evident within Housing and Communities, in relation to homelessness. Despite the Council allocating a significant budget increase for 2023/24, to address the ongoing impact of the overspend incurred last year, costs had increased further and an overspend of £1m was being projected. This was an area that had seen a significant increase in costs over the last two years, following the Welsh Government’s policy aim to dramatically reduce homelessness.

 

(iv)             There were forecasted underspends against non-service budgets, specifically the general contingency and capital financing. Savings in these areas, as set out within the report, were more than offsetting the net service area overspends, resulting in an overall underspend for the whole Council.

 

(v)               There was an anticipated shortfall against the delivery of 2023/24 and prior year savings of over £1.6m. The two services responsible for the majority of the shortfall were Adult Services and Housing and Communities. It was not possible to evidence achievement of the saving within Housing and Communities, especially given the overall overspend in this area. Within Adult Services, whilst some proposals were proving difficult to currently achieve, it was identified that previously unachieved staffing-related savings (totalling £481k) could be permanently offset against the levels of residential income being received from service users. Cabinet was asked to approve the virement required in order for this saving to be shown as permanently achieved.

 

As school variances were managed via individual school’s balances, the overall underspend of £3.5m did not include the schools’ position. Schools were collectively forecasting an overspend against budget of £5.4m which would see balances reduced from £14.4m to £9.1m by the end of the  ...  view the full minutes text for item 4.

5.

Capital Programme Monitoring and Additions Report: September 2023 pdf icon PDF 381 KB

Additional documents:

Minutes:

The Leader presented the Capital Programme monitoring and additions report for September 2023.

 

This was the second monitoring report of the year on capital activity and provided an overview of the updated capital programme, alongside the projected outturn position as of September of this year.

 

The report provided an update on the level of available capital headroom and also detailed the additions to the programme that was identified and sought approval for these additions.

 

The first section outlined the movement in the capital budget since the last report was presented to Cabinet in September, which was the July 2023/24 monitoring and additions report.

 

The net value of additions and amendments to the current capital programme in 23/24 since then was £5.5m, and a breakdown of these additions was given in Appendix A. Cabinet was required to approve these additions and amendments.

 

As a result of these additions as of September 2023, the current budget for 2023/24 was now £90.3m, which was still substantial and would be challenging to deliver in full.

 

The additions within this report included the addition of works to the Duffryn District Heating System totalling £3.139m, for which the Council was liable. The report explained the specific accounting implications surrounding this and Cabinet was specifically required to approve the retrospective use of the Capital Expenditure reserve to fund the creation of the provision that would cover these costs.

 

Cabinet noted that the balance in the reserve carried forward into this financial year would now be reduced by £3.139m. The overall level of capital headroom, however, was no lower than it would have been, as this was the funding source that would have been used for these works, had a provision in the 2022-2023 accounts not been required. 

 

The report also outlined the level of slippage currently being forecasted against the revised £90m budget.

 

Currently, a variance of circa £8m was being projected, the majority of which related to slippage. The report however, noted that these figures were subject to continual review and might change between now and the end of the financial year.

 

The report also detailed the level of capital headroom currently available, which could be used to support new schemes and emerging priorities. This was £8.259m, having decreased by £3.139m following the addition of Duffryn District Heating System onto the programme.

 

Whilst the level of available headroom was higher than it was a year ago, Cabinet noted that it only took a few significant issues to arise for this to be consumed. The use of this needed to be very tightly controlled, in order that the Council was able to respond to critical issues, as and when they emerged. This would require clear prioritisation of only the most pressing and urgent issues.

 

In addition, any opportunity to further increase the headroom needed to be taken, so that it was possible to support as many priorities as possible to ensure that sufficient funding existed to respond to any issues that arose.

 

These regular updates included information  ...  view the full minutes text for item 5.

6.

Half Yearly Treasury Management Monitoring Report 2023/24 pdf icon PDF 349 KB

Additional documents:

Minutes:

The Leader presented the Council’s treasury management report which outlined the activity for the first half of 2023-2024 and confirmed that the treasury activities completed so far during the year complied with the Treasury Strategy previously considered and set by Members.

 

The report compared activity with the year-end position for 2022-2023 and detailed the movement from April to September 2023-2024 and the reasons for those movements. This is the first of two reports received by Cabinet on treasury management during the year.

 

The report included the following information:

 

§  Reminder of the Treasury Strategy agreed.

§  Details of borrowing and investment activity throughout the year.

§  Wider economic considerations e.g. economic climate.

§  A medium to long-term outlook for borrowing need.

§  An examination of activity against prudential indicators, confirming compliance.

 

The report was presented to Governance and Audit Committee in October and was endorsed by them prior to the report being considered by Cabinet.

 

The key highlights included the level of borrowing, which, as of 30 September 2023, decreased by £3.1m from the 2022-2023 outturn position and was now £135.5m. This decrease is in relation to:

 

§  a number of loans which are repaid in instalments over the life of the loan,

§  the redemption of two small Public Works Loan Board (PWLB) maturity loans at the end of September, which did not need to re-financed, and

§  this was netted off by a minimal amount of new long-term borrowing that was taken out, totalling £300k from Salix which was interest free and linked to a specific energy efficiency project.

 

As at the end of September, the Council’s overall borrowing also included six Lender Option/Borrower Option (LOBO) loans totalling £30m. Whilst in the first half of the year these loans were not subject to any change in interest rates, in late October the Council received notification that the lender of a £5m LOBO had elected to increase the interest rate. Following advice from the Council’s treasury advisors, the Council redeemed the loan, rather than accept the increased interest rate. This was because the revised interest rate was higher than the current rate and not dissimilar to current borrowing rates via the PWLB. The Council had sufficient investment balances available at this point to be able to afford the repayment, without the need for new long-term borrowing.

 

The Council received notification earlier this month from another lender of a £5m LOBO loan who had also elected to change the interest rate. Again, following advice, the Council chose to redeem this loan as well, as the revised interest rate was higher than current borrowing rates from the PWLB.

 

Whilst redeeming these loans would ultimately accelerate the Council’s need to undertake new external borrowing, exiting from LOBO arrangements allowed the Council to de-risk an element of its borrowing portfolio, by taking away the risk of further interest rate rises on these specific loans.

 

With regard to investments, the report confirmed that the level of investments increased by £7.4m to £54.7m. However, it  ...  view the full minutes text for item 6.

7.

Council Tax Premiums Report pdf icon PDF 157 KB

Additional documents:

Minutes:

The next report presented by the Leader dealt with the matter of consulting with residents on the introduction of a Council Tax Premium applied to long-term empty properties and second homes in the city as an incentive to bring these homes back into use.

 

Full Council would determine whether this would be undertaken and this report was asking for the Cabinet’s approval to start a consultation exercise with residents on the issue. 

 

There was a high demand for affordable homes in the city, while at the same time, there were nearly 1,000 long-term empty properties in the city and to a lesser extent, second homes.

 

Newport City Council tried to incentivise homeowners to bring these back into use when it was agreed to charge the full rate of Council Tax on these properties and ended the 50% discount, they previously had in 2018/19. Unfortunately, this did not have the impact the Council was seeking.

 

Councils in Wales have the power to charge a Council Tax premium on certain properties such as long-term empty properties and second homes in order to meet various housing and community-related policy objectives in their local areas. The vast majority of other Councils in Wales had already or were soon to introduce some form of premium.

 

Cabinet therefore wished to explore the use of these powers and this report asked Cabinet to approve a consultation on this issue with the residents of Newport. This would be available on the Council’s website.

 

There was concern about the increasing demand for quality and affordable housing in the city and the need to bring as many of these properties back into meaningful use as soon as possible.

 

Cabinet would consider the results and decide on this towards the end of the year and if it would be taken forward, it would be brought to Council in January.

 

Comments of Cabinet Members:

 

§  Councillor Clarke referred to the demand for temporary accommodation. This applied not just to Newport but throughout the UK. Councillor Clarke also mentioned the Council’s commitment to improve the outcome for citizens and to ensure that homelessness was rare. This proposal encouraged property owners to put their properties back into use and would be welcomed by residents. Councillor Clarke hoped that residents would get behind a consultation process, should it take place, and put their opinions forward.

 

§  Councillor Harvey agreed with charging a premium but would much prefer to allow a family to be homed. This issue was not just with homeless people but with people struggling to find a home or fleeing domestic violence. Councillor Harvey therefore fully supported the report.

 

§  Councillor Hughes thanked the Leader for bringing this report forward and said that it was not just about raising revenue but a civic duty for residents who owned empty properties to think about what they were doing as part of the development of the city.  Councillor Hughes therefore encouraged residents to get involved in the consultation as it would make a difference in  ...  view the full minutes text for item 7.

8.

Leisure and Wellbeing Project Update pdf icon PDF 580 KB

Additional documents:

Minutes:

In February 2021, Cabinet approved the delivery of a brand-new Leisure and Wellbeing facility on the land adjacent to the University of South Wales (USW) campus on Usk Way.  This decision followed a public consultation exercise which saw over 1000 people giving feedback on their views. There was overwhelming support for the provision of a new leisure and wellbeing facility. 

 

The Leader was pleased to note that work on the detailed design of the new facility was progressing well, and the report provided an update on the project. 

 

The proposed new leisure and wellbeing facility replaced the former Newport Centre and would provide new, modern, and accessible facilities for residents and visitors, complementing the wider sporting offer which was available across the city. 

 

As outlined in the previous report to Cabinet, retaining the former Newport Centre was not a viable option. It was the oldest facility within the Council’s leisure estate and needed significant investment.  It was also the most expensive Council-owned leisure facility to operate. The centre had complex and outdated plant systems and was wholly reliant on gas. Upgrading this building to achieve carbon net zero standards and comply with modern accessibility standards would not have been achievable without further significant, direct capital investment from the Council. 

 

The new facility was being designed to be carbon net zero in operation and Cabinet was advised that this scheme had the potential to be the first carbon net zero leisure centre in the UK and the first all-electric facility of its type in the UK.  The design team also recovered materials from the Newport Centre for reuse in the new facility, including light fittings, timber panels and glass. This showed a true commitment to circular economy principles.

 

The development of a new leisure and wellbeing facility on the new site also enabled the release of the former Newport Centre site to Coleg Gwent in order for them to relocate their Nash Campus to the City Centre. This was huge benefit to learners who would have a new, modern, and accessible campus in the city centre.

 

Having over 2000 students coming into the city centre would also bring more vibrancy and footfall to the city centre, supporting and benefitting our local businesses. Importantly, residents wanted a new, modern leisure facility and they supported the reuse of the Newport Centre site for a new college campus. 

 

The report confirmed that good progress was being made in delivering the new facility. Planning permission was in place and early in the new year further enabling works would be undertaken on the site. The tender for the main construction project was programmed to be released in February with construction to start on site in June.  The build time for the new facility was expected to take approximately 18 months. 

 

The benefits of the new leisure and wellbeing facility could not be understated and would enable the Council to continue delivering transformational regeneration within the city centre, and deliver a fit for purpose, modern and sustainable  ...  view the full minutes text for item 8.

9.

Annual Digital Report 2022/23 pdf icon PDF 1 MB

Additional documents:

Minutes:

The report provided an assessment of the digital programme for the Council and highlighted where action was required to deliver improvements.

 

This was the fourth Annual Digital Report and the first reporting on the Digital Strategy 2022-27 agreed by Cabinet earlier this year.

 

The strategy was a key component of the delivery of the Council’s Corporate Plan’s aspirations for digital infrastructure, skills and services and would be an important underpin for data-driven transformation of services.

 

The annual report was presented to Overview and Management Scrutiny Committee on 8 September 2023 where valuable feedback and comments were received.

 

The Council, much like other organisations, had an increased reliance on IT systems for effective and efficient service delivery and this was highlighted further by the impact of the pandemic.

 

The report highlighted progress towards the outcomes of the Digital Strategy 2022-27. This was guided by important principles: innovation, data driven, user centred, inclusive, collaborative, secure and green.

 

The strategy had four themes, and the report outlined some key achievements:

 

At this point, the Leader invited Councillor Batrouni to comment on the report. Councillor Batrouni thanked the Digital Team who did a tremendous job during the pandemic by rapidly upscaling and up-skilling the digital provision. This work was continued post pandemic.

 

The Cabinet Member highlighted issues achieved as outlined in the report.


In the Digital Transformation theme, the website redevelopment project commenced with an implementation partner to implement Local Government Drupal. A Council “Smart Home” pilot was launched, led by Adult Services to promote the use and availability of assistive technologies for independent living as well as accessibility issues to meet the needs of residents in the 21st century.  For those who were not digitally connected, those voices were heard, and opinions taken on board, with initiatives such as free Wi-Fi in public buildings.

 

In the Digital Skills and Inclusion theme, the Adult Community Learning team delivered a range of fully accredited ICT and Digital Skills courses. Digital skills courses and Computers Don’t Bite were now free. All Council libraries provided free public access to internet-enabled PCs and the Council provided a free public Wi-Fi service in over 50 public buildings and on Newport buses, in partnership with Newport Transport.

 

With regard to data and collaboration, Newport was at the forefront of this agenda and Monmouthshire Council would be visiting Newport soon to talk about further collaboration.

 

Great strides made with Shared Resource Service (SRS) were highlighted, alongside the work of the Council’s Digital team and service areas in improving IT provision and the impact on service delivery.  Audit Wales acknowledged that considerable progress had been achieved by the Council in using evidence and data to inform decision-making through use of the Newport Intelligence Hub services. Information risk management arrangements were reported in the Annual Information Risk Report. Information and Cyber Security were also reported in the Corporate Risk Register which was also reported to Cabinet.

 

Comments of Cabinet Members:

 

§  Councillor Davies was pleased to see, as noted in the report,  ...  view the full minutes text for item 9.

10.

Annual Compliments, Comments and Complaints Report pdf icon PDF 157 KB

Additional documents:

Minutes:

The Leader presented the report, which provided an overview of how the Council manages compliments, comments and complaints and the Council’s performance for the last year.

 

This report provided an overview broken down by service areas and complaint types and highlighted key trends and themes drawn from the data.

 

The report also reflected on lessons learned for the Council and actions to deliver improvements. 

 

This item was presented to Governance and Audit Committee in September where valuable feedback and comments were received.

 

The report itself detailed compliments, comments and complaints separately and some of the key points relating to each were:

 

§  106 corporate compliments and 36 Social Services compliments were recorded in 2022/23.

 

§  The Council was raising awareness with service areas to ensure that compliments were recorded appropriately.

 

§  2693 comments were recorded during 2022/23. This was a 63% decrease since 2021/22 which reflected improvements made to the categorisation of feedback received, to ensure requests for service were recorded effectively.

 

At this stage, the Leader invited Councillor Batrouni to comment on the report.

 

Councillor Batrouni built on his previous comment about collaboration as well as being a listening Council, which was fundamental. It was important to understand when residents had issues and when they were happy with the service as this was critical to the Council’s understanding. Councillor Batrouni asked residents to please comment on any improvements that could be made by the Council.

 

Comments of Cabinet Members:

 

§  Councillor Davies welcomed the openness and transparency of this report, which was a positive outcome for the Council and residents.  Whilst no one wanted complaints, they were a lesson to be used to improve processes which was a positive outcome.  Councillor Davies always welcomed the compliments and passed this on to the Refuse team, in City Services, when a request for a blue bag was delivered in 24 hours, which made a massive difference to a family, and their recycling needs. Councillor Davies said well done to all involved. Councillor Davies added that we were never quick enough to give compliments or praise for officers that worked hard. Officers cared passionately about Newport and Councillor Davies wanted to extend her thanks.

 

§  Councillor Lacey mentioned that City Services had the highest number of complaints as well as the highest number of compliments. Councillor Lacey then read out two compliments, one relating to the new footbridge over the train station, where a resident started coming into the city centre more frequently as a result. The other compliment referred to a Highways operative, Simon Lock[KM1] , who helped a distressed mother whose baby was choking. Simon looked after the mother and child and made sure that they went home safely.

 

§  The Leader agreed that officers were a tremendous asset to the Council.

 

Decision:

 

Cabinet endorsed the Annual Report on Compliments, Comments and Complaints Management 2022-2023 and proposed actions.


 [KM1]Definitely his name?!

11.

NCC External Pressures - Cost of Living pdf icon PDF 116 KB

Additional documents:

Minutes:

The Leader presented the final report, providing colleagues with an update on the external pressures facing the Council and information on how we were collaborating with our partners and communities to support those in need across the city.

 

This report provided local and UK research on how the cost-of-living crisis continued to impact on household finances, including information on a 6.9% increase in private rental prices across Wales. 

 

In Newport, the lead reason for homelessness continued to be due to loss of rented accommodation and rising rent costs, which had the potential to further increase demand on our housing and homelessness services.

 

The Council was working closely with local and national partners to provide support, advice and guidance where possible, including promoting national schemes such as Warm Wales, and the Welsh Government ‘Help to Stay’ equity loan scheme launched last week to support homeowners who were struggling to afford their mortgage payments and facing the threat of repossession and homelessness. 

 

The Leader took the opportunity to urge residents experiencing difficulties to reach out and contact the Council for information and signposting on the advice and support available; this could be done in person, by phone or by visiting our support and advice pages on the website.

 

Colleagues would be aware of Cabinet’s commitment within the Corporate Plan to work towards Newport becoming a Living Wage City.  The importance of this commitment was reinforced with the announced 10% increase in the Living Wage estimated to benefit over 22,800 workers in Wales.

 

Officers working with our partners and Welsh Government, made significant progress in moving on Ukrainian guests from their initial accommodation by finding alternative housing solutions. 

 

The Leader was delighted to attend the formal launch of the Building a Fairer Gwent report event at the Lysaght’s Institute last month, which further ignited the regional commitment to address health inequality across all of our communities. 

 

As the Leader of the Council and Chair of OneNewport, the Leader continued to advocate for partnership working as being vital in supporting residents and businesses and once again encouraged anybody in need to access the support available. This included linking residents with third-sector partners and the police.

 

Comments of Cabinet Members:

 

§  Councillor Harvey echoed the Leader’s comments that there was a lot of support for residents.  Newport Live was providing support as well as Maindee Primary, that provided a drop-in session once a month, Housing services were available at Newport Library, as well as the Living Wage Foundation. Councillor Harvey thanked staff for their work and added that it was an emotional strain on staff and therefore wanted to recognise what they did for residents of the city. In relation to winter fuel payments, Councillor Harvey urged residents to pick up the phone and contact a councillor, the City Contact Centre, or Library, to find someone who would provide support.

 

§  Councillor Batrouni referred to the cost-of-living situation and also echoed comments of the Leader and Councillor Harvey, adding that officers were committed to providing  ...  view the full minutes text for item 11.

12.

Work Programme pdf icon PDF 96 KB

Additional documents:

Minutes: